FERPAL Infrastructure
  • About Us
    • Mission Statement
    • FERPAL’s Awards
    • Health and Safety
    • Events
  • Services
    • Structural Pipe Lining Solution
    • Other Rehabilitation Solutions
  • Sustainability
  • Customers
  • Projects
    • Projects
    • Videos
    • Images
  • Careers
  • Contact Us
    • News
    • F.A.Q’s
    • Emergency Contact Numbers
    • Door Knocker Notices
  • Menu Menu

DC WATER – QUEBEC STREET CIPP LINING

LOCATION

Quebec Street NW, Washington, DC

CLIENT

DC WATER

GENERAL CONTRACTOR

Capitol Paving

PIPE SIZE

8-inch cast iron watermain

PROJECT LENGTH

2,096 linear feet

TIMELINE

May 12, 2024- July 29, 2024

SERVICES INTERNALLY REINSTATED

49

Project Background

FER-PAL Construction USA was directly hired under an emergency contract as a subcontractor for Capitol Paving. The project involved lining 2,096 feet of 8-inch cast iron watermain using a trenchless method. FER-PAL handled the temporary water supply setup and the installation of the cured-in-place pipe (CIPP) lining, reinstating 49 services internally and ensuring minimal community disturbance.

Overview

This project took place in an affluent, historic residential community with tree-lined streets. Quebec Street NW posed unique challenges, including the potential presence of unexploded military ordnance from the area’s historical use by the military. This required a trenchless rehabilitation approach to avoid excessive ground disturbance while completing the rehabilitation. Additionally, FER-PAL’s process allowed ongoing construction on three homes in the neighborhood to continue simultaneously without requiring any scheduling changes.

Having previous concerns regarding sewer CIPP lining, DC Water and their customers wanted to ensure this project was free of styrene and other emissions. As the ALTRA liner is NSF approved and therefore VOC-free, this was not a concern. However, The University of Texas Arlington was asked to conduct a study to validate this. Following the project, the University published a report verifying that the liner met all of its certifications and was styrene and VOC free.

The trenchless method minimized disruption to the neighborhood, met Department of Transportation guidelines without having to repave the entire street, and reduced project duration compared to open-cut method. FER-PAL successfully completed this work in compliance with Washington, DC’s environmental laws—the strictest in the country—delivering an efficient and minimally invasive solution.

Download - Case Study
  • City of Hamilton 2020 Multi-Year Project
  • City of London 2020 Multi-Year Project
  • City of Prince Albert, SK Watermain Rehabilitation
  • City of Toronto 19TW-CTS-O2CWD
  • City of Toronto 20TW-CTS-02 Contract
  • City of Toronto Case Study 19TW-CTS-01
  • City of Toronto Case Study 20TW-CTS-03 Contract
  • City of Toronto Willowdale Res. Rehab
  • DC WATER – 3RD STREET TUNNEL- TRENCHLESS REHABILITATION
  • DC WATER – QUEBEC STREET CIPP LINING
  • Dixon, IL CIPP Renewal
  • Edina, MN CIPP Renewal
  • Elgin, IL CIPP Renewal
  • Halifax, NS Forcemain CIPP Lining
  • IRON ORE COMPANY OF CANADA – LABRADOR CITY CIPP LINING
  • Lima, OH CIPP Renewal
  • Lincoln Nebraska CIPP Renewal
  • Madison, WI CIPP Renewal
  • Madison, WI CIPP Renewal
  • Markham Emergency Watermain Break Rehab
  • Marmora and Lake, ON Watermain Rehabilitation
  • Omaha Nebraska CIPP Renewal
  • Saline, MI CIPP Renewal
  • Sudbury, ON Watermain Rehabilitation
Search Search

Follow us

  • facebook
  • youtube
  • linkedin

REQUEST INFORMATION

We're happy to answer all of your questions! Send us a message and we'll send you an information packet shortly.

WHAT COMMUNITIES SAY ABOUT US:

Lindsay

“ The employees who have been working out in front of my house have been great. Very polite, respectful and most pleasant. ”

Robert

“ The FERPAL employees have been extremely polite and working nonstop to try and complete this work in Waterloo. Whatever you guys are doing keep it up, Good Job! ”

Roland – Building Commissioner

“ FERPAL was extremely polite and professional when working in our neighbourhood. ”

Request Information
Send us a message and we'll send you an information packet shortly.
Accessibility Standards
FERPAL Construction LTD.
171 Fenmar Drive,
Toronto, Ontario M9L1M7
Canada
Tel: 416-742-3713
Fax: 416-742-3889
Toll Free: 1-866-344-1058
info@ferpalinfrastructure.com Media Inquiries:
mediarelations@coreaqua.com

Follow us

  • facebook
  • linkedin
  • youtube
FERPAL Construction USA LLC.
26187 Northline Road Taylor, Michigan 48180, USA
Tel: 734-946-2034
Fax: 734-946-2036
info@ferpalinfrastructure.com
FERPAL Construction USA LLC.
1350 Gasket Dr.
Elgin, Illinois 60120, USA
Tel: 847-214-0103
Fax: 847-214-0104
info@ferpalinfrastructure.com
FERPAL Construction USA LLC.
391 Prince Georges Blvd.
Upper Marlboro, MD 20774
USA
info@ferpalinfrastructure.com FER-PAL logo
© Copyright 2026. FERPAL Construction Ltd. Powered By: SitePartners
  • Link to Facebook
  • Link to LinkedIn
  • Link to Youtube
Scroll to top Scroll to top Scroll to top