LOCATION
Quebec Street NW, Washington, DC
CLIENT
DC WATER
GENERAL CONTRACTOR
Capitol Paving
PIPE SIZE
8-inch cast iron watermain
PROJECT LENGTH
2,096 linear feet
TIMELINE
May 12, 2024- July 29, 2024
SERVICES INTERNALLY REINSTATED
49
FER-PAL Construction USA was directly hired under an emergency contract as a subcontractor for Capitol Paving. The project involved lining 2,096 feet of 8-inch cast iron watermain using a trenchless method. FER-PAL handled the temporary water supply setup and the installation of the cured-in-place pipe (CIPP) lining, reinstating 49 services internally and ensuring minimal community disturbance.
This project took place in an affluent, historic residential community with tree-lined streets. Quebec Street NW posed unique challenges, including the potential presence of unexploded military ordnance from the area’s historical use by the military. This required a trenchless rehabilitation approach to avoid excessive ground disturbance while completing the rehabilitation. Additionally, FER-PAL’s process allowed ongoing construction on three homes in the neighborhood to continue simultaneously without requiring any scheduling changes.
Having previous concerns regarding sewer CIPP lining, DC Water and their customers wanted to ensure this project was free of styrene and other emissions. As the ALTRA liner is NSF approved and therefore VOC-free, this was not a concern. However, The University of Texas Arlington was asked to conduct a study to validate this. Following the project, the University published a report verifying that the liner met all of its certifications and was styrene and VOC free.
The trenchless method minimized disruption to the neighborhood, met Department of Transportation guidelines without having to repave the entire street, and reduced project duration compared to open-cut method. FER-PAL successfully completed this work in compliance with Washington, DC’s environmental laws—the strictest in the country—delivering an efficient and minimally invasive solution.