LOCATION
Omaha, NE
CLIENT
Omaha Metropolitan Utility District
CONSULTANT
_____
PIPE SIZE
1815ft of 12”, 2465ft of 8”, 8295ft of 6”
PROJECT LENGTH
12,575ft
BUDGET
$3,756,795.25
TIMELINE
May-October, 2019
SERVICES INTERNALLY REINSTATED
220
SERVICES REPLACEMENTS
196
Project Background
Having previous success using Aqua-Pipe CIPP, Omaha MUD looked to the technology to rehabilitate three separate locations across the City. This included a major arterial roadway as well as a large residential area.
Overview
FER-PAL teamed up with local contractor, Heimes Contracting, to complete the project. FER-PAL, as the general contractor, was responsible for the project management along with the temporary bypass and CIPP portion of the project. As a subcontractor, Heimes was responsible for the restorations and civil works. The project was completed over the course of the summer with the restorations for the project completed in the fall. FER-PAL successfully reinstated 97% of the services within the project ensuring that the project maintained its limited impact.
Request Information
Send us a message and we'll send you an information packet shortly.Accessibility Standards
FERPAL Construction LTD.
171 Fenmar Drive,Toronto, Ontario M9L1M7
Canada
Tel: 416-742-3713
Fax: 416-742-3889
Toll Free: 1-866-344-1058
info@ferpalinfrastructure.com Media Inquiries:
mediarelations@coreaqua.com
Follow us
FERPAL Construction USA LLC.
26187 Northline Road Taylor, Michigan 48180, USATel: 734-946-2034
Fax: 734-946-2036
info@ferpalinfrastructure.com
FERPAL Construction USA LLC.
1350 Gasket Dr.Elgin, Illinois 60120, USA
Tel: 847-214-0103
Fax: 847-214-0104
info@ferpalinfrastructure.com
FERPAL Construction USA LLC.
391 Prince Georges Blvd.Upper Marlboro, MD 20774
USA
info@ferpalinfrastructure.com