FERPAL Infrastructure
  • About Us
    • Mission Statement
    • FERPAL’s Awards
    • Health and Safety
    • Events
  • Services
    • Structural Pipe Lining Solution
    • Other Rehabilitation Solutions
  • Sustainability
  • Customers
  • Projects
    • Projects
    • Videos
    • Images
  • Careers
  • Contact Us
    • News
    • F.A.Q’s
    • Emergency Contact Numbers
    • Door Knocker Notices
  • Menu Menu

Marmora and Lake, ON Watermain Rehabilitation

CLIENT

Municipality of Marmora & Lake

CONTRACTOR

McInroy-Maines Construction
Limited, FER-PAL Infrastructure

LOCATION

Hwy 7 Crowe River Crossing,
Marmora, Ontario

PIPE SIZE

200mm ductile iron watermain

PROJECT LENGTH

112 meters

TIMELINE

Mobilized on July 2 2024, lined out by July 24 2024 (4 days of on-site work)

Project Background

The Municipality of Marmora & Lake faced a critical watermain break under the Crowe River Crossing. This break threatened the integrity of the local water supply, increasing the risk of river water infiltration into the municipal water system.
The watermain, which ran into the city and serviced residents and businesses, was located beneath the Crowe River. Rapid repair was essential to prevent disruption to the community.

Overview

FER-PAL Infrastructure was directly hired to address this watermain break. The Municipality of Marmora & Lake required a quick response with consideration for safeguarding the existing environment and infrastructure at the Crowe River crossing. Under the general contractor McInroy-Maines Construction Limited, FER-PAL installed an internal repair sleeve that was remotely installed to prevent infiltration during the liner installation. The 112-meter section of the 200mm ductile iron watermain was cleaned and lined with minimal disruption to the affected community and natural environment.
The key challenges included identifying and patching unknown breaks within the pipe, ensuring the watermain was dry for lining, and preventing further infiltration from the river. Cooperation with the Municipality of Marmora & Lake ensured smooth execution without additional difficulties.
Notably, the client first called FER-PAL about the project on July 2, with the entire project being completed by July 24. The project was successfully completed in just over three weeks, with four total days of on-site work.
FER-PAL successfully repaired and renewed the watermain, preventing further infiltration and ensuring the reliability of the water supply. Because FER-PAL rehabilitated the existing watermain, a full redesign of the water system was not required, saving time and money.

Download - Case Study
  • City of Hamilton 2020 Multi-Year Project
  • City of London 2020 Multi-Year Project
  • City of Prince Albert, SK Watermain Rehabilitation
  • City of Toronto 19TW-CTS-O2CWD
  • City of Toronto 20TW-CTS-02 Contract
  • City of Toronto Case Study 19TW-CTS-01
  • City of Toronto Case Study 20TW-CTS-03 Contract
  • City of Toronto Willowdale Res. Rehab
  • DC WATER – 3RD STREET TUNNEL- TRENCHLESS REHABILITATION
  • DC WATER – QUEBEC STREET CIPP LINING
  • Dixon, IL CIPP Renewal
  • Edina, MN CIPP Renewal
  • Elgin, IL CIPP Renewal
  • Halifax, NS Forcemain CIPP Lining
  • IRON ORE COMPANY OF CANADA – LABRADOR CITY CIPP LINING
  • Lima, OH CIPP Renewal
  • Lincoln Nebraska CIPP Renewal
  • Madison, WI CIPP Renewal
  • Madison, WI CIPP Renewal
  • Markham Emergency Watermain Break Rehab
  • Marmora and Lake, ON Watermain Rehabilitation
  • Omaha Nebraska CIPP Renewal
  • Saline, MI CIPP Renewal
  • Sudbury, ON Watermain Rehabilitation
Search Search

Follow us

  • facebook
  • youtube
  • linkedin

REQUEST INFORMATION

We're happy to answer all of your questions! Send us a message and we'll send you an information packet shortly.

WHAT COMMUNITIES SAY ABOUT US:

Lindsay

“ The employees who have been working out in front of my house have been great. Very polite, respectful and most pleasant. ”

Robert

“ The FERPAL employees have been extremely polite and working nonstop to try and complete this work in Waterloo. Whatever you guys are doing keep it up, Good Job! ”

Roland – Building Commissioner

“ FERPAL was extremely polite and professional when working in our neighbourhood. ”

Request Information
Send us a message and we'll send you an information packet shortly.
Accessibility Standards
FERPAL Construction LTD.
171 Fenmar Drive,
Toronto, Ontario M9L1M7
Canada
Tel: 416-742-3713
Fax: 416-742-3889
Toll Free: 1-866-344-1058
info@ferpalinfrastructure.com Media Inquiries:
mediarelations@coreaqua.com

Follow us

  • facebook
  • linkedin
  • youtube
FERPAL Construction USA LLC.
26187 Northline Road Taylor, Michigan 48180, USA
Tel: 734-946-2034
Fax: 734-946-2036
info@ferpalinfrastructure.com
FERPAL Construction USA LLC.
1350 Gasket Dr.
Elgin, Illinois 60120, USA
Tel: 847-214-0103
Fax: 847-214-0104
info@ferpalinfrastructure.com
FERPAL Construction USA LLC.
391 Prince Georges Blvd.
Upper Marlboro, MD 20774
USA
info@ferpalinfrastructure.com FER-PAL logo
© Copyright 2026. FERPAL Construction Ltd. Powered By: SitePartners
  • Link to Facebook
  • Link to LinkedIn
  • Link to Youtube
Scroll to top Scroll to top Scroll to top