LOCATION
IOC Mine Site, Labrador City, Newfoundland and Labrador
CLIENT
Iron Ore Company of Canada
GENERAL CONTRACTOR
Bird Construction
PIPE SIZE
300 mm (12-inch) cast iron fire water line
PROJECT LENGTH
440 metres
TIMELINE
May 22 – June 5, 2025
The Iron Ore Company of Canada required a trenchless solution to rehabilitate 440 metres of a failing 300 mm cast iron fire water line running beneath railway tracks at one of Canada’s largest iron ore mines. The host pipe had suffered multiple breaks and was essential to fire protection on-site. With a scheduled site-wide shutdown involving over 4,000 workers on the horizon, the fire line had to be fully operational in advance to prevent a hot-work ban.
FER-PAL was engaged as the trenchless rehabilitation expert under Bird Construction’s general contracting term. Since previous breaks were located under the railroad tracks, a trenchless solution was required. FER-PAL provided cleaning, CCTV inspection, internal patching of the damaged host pipe, CIPP lining, and pressure testing of the rehabilitated line. The project was executed quickly, precisely, and with minimal impact to the surrounding infrastructure.
Given the remote location, complex logistics, and rigid shutdown deadline, FER-PAL engaged in extensive pre-project planning. This included advance site visits, strict health and safety pre-qualification, in-person site-specific training, and travel coordination. Despite the complexity, the team delivered on time and without delays, allowing IOC to proceed with its major maintenance operations. The trenchless approach not only prevented disruption to the rail infrastructure but also provided a fully structural solution that extended the life of the fire protection system, on time and within budget.