LOCATION
Akerley Boulevard, Halifax, Nova Scotia
CLIENT
Halifax Water
CONTRACTOR
FER-PAL Infrastructure
PIPE SIZE
200mm (8-inch) ductile iron sanitary forcemain
PROJECT LENGTH
462 metres
TIMELINE
August 9-30, 2024
Halifax Water sought to rehabilitate a deteriorating ductile iron sanitary forcemain along Akerley Boulevard, a busy commercial area with a history of breaks. The forcemain ran beneath CN railroad tracks and along a heavily trafficked arterial road, requiring unique considerations for traffic management and public access. Halifax Water was adamant that a Cured-In-Place Pipe (CIPP) lining solution was needed to rehabilitate the forcemain to maintain traffic flow on a busy arterial road.
The project required careful coordination with multiple stakeholders including Halifax Water, CN, Halifax Regional Municipality, and Robinson Consultants. Given the location under a rail crossing and high-traffic area, extensive planning was required to manage traffic, obtain necessary permits, and minimize disruptions. Many businesses were located on this project including warehouses, manufacturing, large commercial buildings and offices. Due to the busy nature of this arterial road, work had to be completed overnight and on weekends to minimize traffic disruptions. FER-PAL employed a trucking bypass system to transport sewage from the pumping station, avoiding the need for an above-ground bypass that would have caused further congestion on the southbound lane of Akerley Boulevard.
Despite these challenges, FER-PAL completed the project on time and under budget, delivering a solution that extended the forcemain’s lifespan by an additional 100 years. By utilizing FER-PAL’s Cured-In-Place Pipe lining solution, Halifax experienced minimized restoration costs and continued access to businesses along Akerley Boulevard.