FERPAL Infrastructure
  • About Us
    • Mission Statement
    • FERPAL’s Awards
    • Health and Safety
    • Events
  • Services
    • Structural Pipe Lining Solution
    • Other Rehabilitation Solutions
  • Sustainability
  • Customers
  • Projects
    • Projects
    • Videos
    • Images
  • Careers
  • Contact Us
    • News
    • F.A.Q’s
    • Emergency Contact Numbers
    • Door Knocker Notices
  • Menu Menu

DC WATER – 3RD STREET TUNNEL- TRENCHLESS REHABILITATION

LOCATION

3rd Street Tunnel, Central Downtown Washington, DC

CLIENT

DC WATER

GENERAL CONTRACTOR

Capitol Paving

PIPE SIZE

8-inch cast iron watermain

PROJECT LENGTH

1,148 linear feet

TIMELINE

September-October 2024

Project Background

The 3rd Street tunnel faced a severe water break leading to flooding and disruption in a high-traffic area of downtown Washington, DC. The break caused water outages for seven residential apartment buildings and business properties, emphasizing the urgent need for repair. Given the location’s sensitivity and high visibility, DC Water engaged Capitol Paving under an emergency contract, with FER-PAL Construction USA brought in to perform trenchless rehabilitation on the water main.

Overview

FER-PAL successfully rehabilitated 1,148 linear feet of 8-inch cast iron watermain in the confined environment of the 3rd Street tunnel using ALTRA CIPP (Cured-In-Place Pipe) technology. This trenchless approach was ideal for minimizing disruption in a high-traffic area, avoiding extensive excavation, and ensuring continuous operations in downtown Washington, DC. FER-PAL also provided temporary water connections to hydrants, ensuring uninterrupted fire protection during the project.

The project presented challenges, including restricted space within the tunnel and water seepage through tunnel cracks. FER-PAL adapted efficiently by sealing leaks to prevent further delays, coordinating equipment movement in tight quarters, and modifying plans to accommodate limited access points. Despite these obstacles, the project proceeded on schedule.

Through the use of trenchless technology, FER-PAL minimized inconvenience to nearby residents and businesses. This method also allowed for faster project completion in compliance with Washington, DC’s stringent environmental regulations and the Washington DC Department of Transportation guidelines. FER-PAL’s successful work earned commendations from DC Water and project consultants, highlighting the team’s ability to deliver quality results under challenging conditions.

Download - Case Study
  • City of Hamilton 2020 Multi-Year Project
  • City of London 2020 Multi-Year Project
  • City of Prince Albert, SK Watermain Rehabilitation
  • City of Toronto 19TW-CTS-O2CWD
  • City of Toronto 20TW-CTS-02 Contract
  • City of Toronto Case Study 19TW-CTS-01
  • City of Toronto Case Study 20TW-CTS-03 Contract
  • City of Toronto Willowdale Res. Rehab
  • DC WATER – 3RD STREET TUNNEL- TRENCHLESS REHABILITATION
  • DC WATER – QUEBEC STREET CIPP LINING
  • Dixon, IL CIPP Renewal
  • Edina, MN CIPP Renewal
  • Elgin, IL CIPP Renewal
  • Halifax, NS Forcemain CIPP Lining
  • IRON ORE COMPANY OF CANADA – LABRADOR CITY CIPP LINING
  • Lima, OH CIPP Renewal
  • Lincoln Nebraska CIPP Renewal
  • Madison, WI CIPP Renewal
  • Madison, WI CIPP Renewal
  • Markham Emergency Watermain Break Rehab
  • Marmora and Lake, ON Watermain Rehabilitation
  • Omaha Nebraska CIPP Renewal
  • Saline, MI CIPP Renewal
  • Sudbury, ON Watermain Rehabilitation
Search Search

Follow us

  • facebook
  • youtube
  • linkedin

REQUEST INFORMATION

We're happy to answer all of your questions! Send us a message and we'll send you an information packet shortly.

WHAT COMMUNITIES SAY ABOUT US:

Lindsay

“ The employees who have been working out in front of my house have been great. Very polite, respectful and most pleasant. ”

Robert

“ The FERPAL employees have been extremely polite and working nonstop to try and complete this work in Waterloo. Whatever you guys are doing keep it up, Good Job! ”

Roland – Building Commissioner

“ FERPAL was extremely polite and professional when working in our neighbourhood. ”

Request Information
Send us a message and we'll send you an information packet shortly.
Accessibility Standards
FERPAL Construction LTD.
171 Fenmar Drive,
Toronto, Ontario M9L1M7
Canada
Tel: 416-742-3713
Fax: 416-742-3889
Toll Free: 1-866-344-1058
info@ferpalinfrastructure.com Media Inquiries:
mediarelations@coreaqua.com

Follow us

  • facebook
  • linkedin
  • youtube
FERPAL Construction USA LLC.
26187 Northline Road Taylor, Michigan 48180, USA
Tel: 734-946-2034
Fax: 734-946-2036
info@ferpalinfrastructure.com
FERPAL Construction USA LLC.
1350 Gasket Dr.
Elgin, Illinois 60120, USA
Tel: 847-214-0103
Fax: 847-214-0104
info@ferpalinfrastructure.com
FERPAL Construction USA LLC.
391 Prince Georges Blvd.
Upper Marlboro, MD 20774
USA
info@ferpalinfrastructure.com FER-PAL logo
© Copyright 2026. FERPAL Construction Ltd. Powered By: SitePartners
  • Link to Facebook
  • Link to LinkedIn
  • Link to Youtube
Scroll to top Scroll to top Scroll to top