3rd Street Tunnel, Central Downtown Washington, DC
CLIENT
DC WATER
GENERAL CONTRACTOR
Capitol Paving
PIPE SIZE
8-inch cast iron watermain
PROJECT LENGTH
1,148 linear feet
TIMELINE
September-October 2024
The 3rd Street tunnel faced a severe water break leading to flooding and disruption in a high-traffic area of downtown Washington, DC. The break caused water outages for seven residential apartment buildings and business properties, emphasizing the urgent need for repair. Given the location’s sensitivity and high visibility, DC Water engaged Capitol Paving under an emergency contract, with FER-PAL Construction USA brought in to perform trenchless rehabilitation on the water main.
FER-PAL successfully rehabilitated 1,148 linear feet of 8-inch cast iron watermain in the confined environment of the 3rd Street tunnel using ALTRA CIPP (Cured-In-Place Pipe) technology. This trenchless approach was ideal for minimizing disruption in a high-traffic area, avoiding extensive excavation, and ensuring continuous operations in downtown Washington, DC. FER-PAL also provided temporary water connections to hydrants, ensuring uninterrupted fire protection during the project.
The project presented challenges, including restricted space within the tunnel and water seepage through tunnel cracks. FER-PAL adapted efficiently by sealing leaks to prevent further delays, coordinating equipment movement in tight quarters, and modifying plans to accommodate limited access points. Despite these obstacles, the project proceeded on schedule.
Through the use of trenchless technology, FER-PAL minimized inconvenience to nearby residents and businesses. This method also allowed for faster project completion in compliance with Washington, DC’s stringent environmental regulations and the Washington DC Department of Transportation guidelines. FER-PAL’s successful work earned commendations from DC Water and project consultants, highlighting the team’s ability to deliver quality results under challenging conditions.