FER-PAL Infrastructure
  • About Us
    • Mission Statement
    • FER-PAL’s Awards
    • Health and Safety
  • Services
    • Structural Pipe Lining Solution
    • Other Rehabilitation Solutions
  • Sustainability
  • Customers
  • Projects
    • Videos
    • Images
  • Contact Us
    • News
    • Careers
    • F.A.Q’s
    • Emergency Contact Numbers
    • Door Knocker Notices
  • Menu Menu

City of Toronto Case Study 19TW-CTS-01

LOCATION

City of Toronto

CLIENT

City of Toronto

CONSULTANT

WSP

PIPE SIZE

150mm, 300mm

PROJECT LENGTH

4,500m

BUDGET

$13,447,221.48

TIMELINE

April 2019 – November 2020

SERVICES INTERNALLY REINSTATED

308

SERVICES REPLACEMENTS

200

Project Background

This project was apart of the City’s yearly watermain rehabilitation program to address its aging and failing watermains. This contract included both cast iron and ductile watermains including a portion that contained insitu-lined cement mortar that required removal. The City added multiple sites to the project at the end of 2019 which were to be completed in 2020.

Overview

This project contained three separate sites across the City of Toronto. Included within this was a residential and commercial stretch of Pape Avenue. a dense residential pocket of Westmoreland Avenue and Shanley Street as well as a short residential section of Bell haven Road.

The Pape site was situated on an arterial roadway which required a complex Traffic Protection Plan and limited the available working hours. This project buttoned up next to an open-cut watermain replacement project that had begun before the CIPP project. As a two-block section of separation was required, FER-PAL completed the majority of their work within three months yet had to wait until the open-cut portion was completed before they could wrap things up fully. The two-block portion was completed the following year after the open-cut replacement project was completed.

The Westmoreland and Bellhaven sites were located within dense residential areas of the City which required a high level of coordination to determine which services were substandard and which ones required internal reinstatement. One of the largest challenges on this contract was the removal of existing cement mortar lining that no longer was required within the host main. In total 890 m was removed before lining to ensure the watermain ID was restored to its original size.

In total, the contract included 200 substandard water service replacements. In addition to this FER-PAL successfully reinstated 308 services achieving a 96% successful reinstatement rate.

Download - Case Study
  • City of Hamilton 2020 Multi-Year Project
  • City of London 2020 Multi-Year Project
  • City of Toronto 19TW-CTS-O2CWD
  • City of Toronto 20TW-CTS-02 Contract
  • City of Toronto Case Study 19TW-CTS-01
  • City of Toronto Case Study 20TW-CTS-03 Contract
  • City of Toronto Willowdale Res. Rehab
  • Dixon, IL CIPP Renewal
  • Edina, MN CIPP Renewal
  • Elgin, IL CIPP Renewal
  • Lima, OH CIPP Renewal
  • Lincoln Nebraska CIPP Renewal
  • Madison, WI CIPP Renewal
  • Madison, WI CIPP Renewal
  • Markham Emergency Watermain Break Rehab
  • Omaha Nebraska CIPP Renewal
  • Saline, MI CIPP Renewal

Follow us

  • facebook
  • twitter
  • youtube
  • linkedin

REQUEST INFORMATION

We're happy to answer all of your questions! Send us a message and we'll send you an information packet shortly.

WHAT COMMUNITIES SAY ABOUT US:

Lindsay

“ The employees who have been working out in front of my house have been great. Very polite, respectful and most pleasant. ”

Robert

“ The FER-PAL employees have been extremely polite and working nonstop to try and complete this work in Waterloo. Whatever you guys are doing keep it up, Good Job! ”

Roland – Building Commissioner

“ FER-PAL was extremely polite and professional when working in our neighbourhood. ”

Request Information
Send us a message and we'll send you an information packet shortly.
Accessibility Standards
FER-PAL Construction LTD.
171 Fenmar Drive, Toronto, Ontario M9L1M7 Canada Tel: 416-742-3713 Fax: 416-742-3889 Toll Free: 1-866-344-1058 info@ferpalinfrastructure.com

Follow us

  • facebook
  • twitter
  • linkedin
  • youtube
FER-PAL Construction USA LLC.
26187 Northline Road Taylor, Michigan 48180 USA Tel: 734-946-2034 Fax: 734-946-2036 info@ferpalinfrastructure.com
FER-PAL Construction USA LLC.
1350 Gasket Dr. Elgin, IlIinois 60120 USA Tel: 847-214-0103 Fax: 847-214-0104 info@ferpalinfrastructure.com
© Copyright 2023. FER-PAL Construction Ltd.
  • Facebook
  • LinkedIn
  • Twitter
  • Youtube
Scroll to top